We have been making good progress on the carport roof.
Tyler came over and moved all the sheets of osb onto the roof for us, to make it easier for us to lay it.
One of the reasons we are doing shingles on this roof is if it is metal or plastic I cannot get to the siding on the house that is in desperate need of a good cleaning...
Suzi aka 'muscles' has been hard at work flipping osb and hammering nails with me.
Getting all the rafter set was a bit time consuming since we had to put a birds beak knotch in 2 places on each of the 15 - 2x6 boards.
No comments:
Post a Comment