Monday, August 27, 2012

Aug 27, 2012

Here is a shot of the Ledger board.  We are keeping it, the joists and the posts and beam from the carport for the camper area.



I decided to paint the underside of the osb board before it was placed on the roof. 
This is just primer.


Here it is painted on the side that will face down.  (the ceiling)


Tyler has helped me by putting the osb board on the roof.



He also poured some concrete under the pier blocks.

Then Susan and Dana came over and helped me plumb up the posts that the 2nd beam will eventually sit on. 

The brown board going from the old rafters to the new post is where the roof line will eventually be.